The Raw Material Handling Plant (RMHP) receives the basic raw materials required for the steel making process from various sources through railway wagons and by road. These are stacked by stackers and reclaimed by reclaimers and distributed to various departments of VSP through conveyor system. The Iron Ore Fines, Iron Ore Lump, Sized Iron
These raw materials are sent to various departments as indicated below:
Sinter Plant:
Blast Furnace: Sized
and Coke.
SMS: Dolomite (SMS), Sized Iron
CRMP: Limestone (SMS), Dolomite (SMS), Dolo chips.
TPP: Crushed Boiler Coal.
COCCP: Imported coking coal (ICC), Medium coking coal (MCC).
The Raw Material Handling Plant is divided into two sections Coal Handling Plant (CHP) and
The facilities available in two sections are as follows:
COAL HANDLING PLANT ORE HANDLING PLANT
* 2 Wagon Tipplers * 3 Wagon Tipplers
* 5 Ground & 10 Track Hoppers * 10 Ground and 10 Track Hoppers
* Stock Yards ( 10 Beds) * Stock Yard (12 Beds)
* Boiler Coal Crushing Plant *
* Stackers, Reclaimers *
and Stacker cum Reclaimer
. * Stackers and Reclaimers.
* Reclaiming Conveyors * Reclaiming Conveyors
* Stacking Conveyors *Stacking Conveyors